News at Chemical Recoveries - Use the Menus on the left to select some of our news items

Energy Survey now complete

We have completed our Energy Survey as part of our preparations for IPPC. We were assisted in this by an Initial Assessment of Energy Saving Opportunities at Chemical Recoveries. This assessment and report are provided by Shaw E&I, Europe and have been funded by the Action Energy programme.

We have looked at our consumption of Gas, Electricity and Water.

The graphs below show where and how much we use:

The site consumes approximately 4.2 million kWh of energy per annum (based on the twelve months up to the end of March 2004), costing a total of almost £83,000. For the avoidance of doubt, all energy terms are in delivered energy. 

 This comprises: 

Utility Energy Consumption Cost CO2 emissions
  kWh/year

%

£/year % (Tonnes)
Electricity 1,098,561 26%  £ 42,717 52%     472
Gas 1,536,225 37%  £ 15,965 19%     292
Gas Oil 1,553,113 37%  £ 24,017 29%     388
Total Energy 4,187,899    £82,699    1,153

The following graphs present this information graphically: 

Where do use Electricity? -

A very rough split of the site’s electrical consumption is given below: 

 Unfortunately it was not possible to undertake a similar analysis of the combined gas and gas oil consumption of the steam boilers as the oil delivery dates do not necessarily relate to the period of consumption.

Recommendations to reduce consumption

The recommendations listed below are prioritised, reflecting a balance between the time to implement, estimated cost to implement and savings expected.  Recommendations scoring favourably on all three criteria are highest priority, two out of three medium priority. 

Priority

Recommendation and key actions

 
Estimated annual savings Estimated cost (£) Payback period (years)
(£) CO2 (tonnes) (kWh)
1 Manage vacuum usage  £   461 4.8  11,232 Negligible Immediate
2 Procure only high efficiency motors  £   450 4.7  10,985 Negligible Immediate
3 Check combustion performance of boiler A  £   200 2.9  15,362 Negligible Immediate
4 Install gas supply to boiler B  £7,700 93.0  None  £  4,000 0.5
5 Insulate steam pipe work  £4,853 85.4 388,235  £  3,000 0.6
6 Implement M&T on the processes  £1,666 23.0  83,576  £  2,000 1.2
7 Install photo cell controllers on external lights  £  300 3.2    7,329  £     400 1.3
8 Undertake infra-red and c.air surveys  £  330 4.5   16,147  £     500 1.5
9 Recover condensate  £1,542 27.2  123,400  £  4,000 2.6
10 Change from c.air to pumped agitation TBA   TBA TBA  TBA TBA
TOTALS    £  17,502 248.7 656,267  £    13,900 0.8

We are already addressing and following some of the recommendations.